Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18AD0026

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18AD0026","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS :CONSTRUCTION OF SALVADOR-BUCONG-DARAPIDAP FLOOD CONTROL (UPSTREAM SECTION), CANDON CITY, ILOCOS SUR","Flood Control and Drainage","Completed",48985150.99,0,100,"Ilocos Sur 2nd DEO","Region I","CHIARA2300 INCORPORATED (8736) / FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP. (11645)","2018-04-02","2019-10-01",2018,"Regular Infra - GAA 2018 OO-2",17.23425,120.45873,"102906000","102900000"]
SHA-256
7497d0685a5b01a76dd4afb301cec86be498383bad775dd777e752701a38651e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.