Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18AD0040

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18AD0040","CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION STRUCTURES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS : CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SILAG-STA. MARIA RIVER, STA. MARIA, ILOCOS SUR","Flood Control and Drainage","Completed",18620113.65,0,100,"Ilocos Sur 2nd DEO","Region I","MBB CONSTRUCTION AND SUPPLY (FORMERLY: MBB CONSTRUCTION) (11363)","2018-02-19","2018-06-18",2018,"Regular Infra - GAA 2018 OO-2",17.36191,120.49666,"102926000","102900000"]
SHA-256
fa15c0abbe963edff4cc2b75441f06b61c2562b599fca06e78c27fb9ea2253ef

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.