Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18AD0048

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18AD0048","CONSTRUCTION OF SALCEDO - DEL PILAR ROAD LEADING TO TIRAD PASS,SALCEDO AND DEL PILAR, ILOCOS SUR","Roads","Completed",37821474.4,0,100,"Ilocos Sur 2nd DEO","Region I","TRIBU DESIGN & CONSTRUCTION (12756)","2018-02-23","2021-06-29",2018,"Regular Infra - GAA 2018 LP",17.1334,120.57348,"102916000","102900000"]
SHA-256
03b2402bbc4c093db5c717de359c7e390d3de6393d8f7cdc26cbe4d2086ebdb6

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.