Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18AH0092

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18AH0092","REHABILITATION OF RIVERBANK PROTECTION OF DUMOLOC RIVER,CAYANGA SECTION BUGALLON, PANGASINAN","Flood Control and Drainage","Completed",27928710.1,0,100,"Pangasinan 2nd DEO","Region I","BMK CONSTRUCTION CORPORATION (FORMERLY B.M.K. CONSTRUCTION) (8292)","2018-02-23","2018-09-25",2018,"Regular Infra - GAA 2018 OO-2",15.92954,120.22007,"105515000","105500000"]
SHA-256
21588b8e388885756c0ba3bc39b7a7b870b53a5d89a28a7f9fd423b7a41eb229

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.