Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18BB0029

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18BB0029","ASSET PRESERV'TN PROG. - REHAB./RECONST. OF RDS W/ SLIPS,SLOPE COLLAPSE & LANDSLIDE-SECON.RDS-MMR-K0560+000-K0560+050, K0560+150 - K0560+280, K0560+340-K0560+520, K0560+599 - K0560+729, K0560+835-K0560+924 BRGY.SAN MARIANO, LAL-LO, CAGAYAN (S00681LZ)","Roads","Completed",23674112.23,0,100,"Cagayan 1st DEO","Region II","ORIENT STAR CONSTRUCTION, INC. (FORMERLY: ORIENT S (7183)","2018-05-03","2019-04-01",2018,"Regular Infra - GAA 2018 OO-1",18.14306,121.72634,"201516000","201500000"]
SHA-256
1e6b53cfdcbb90e27123a84602c836c07ae5bc17b1e86b3b17309a9a543e69cb

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.