Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18BB0127

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18BB0127","CONSTRUCTION AND COMPLETION OF TWO-STOREY 8-CL (2-SCI-LAB & 2-ICT) SCHOOL BUILDING (9.5M X 46.00M) BAGGAO NATIONAL AGRICULTURAL SCHOOL, BAGGAO, CAGAYAN","Buildings and Facilities","Completed",20980500,0,100,"Cagayan 1st DEO","Region II","E.C.T. CONSTRUCTION (10060)","2018-09-04","2019-08-18",2018,"Outside Infra - GAA 2018 DepEd BEFF",17.95532,121.91259,"201506000","201500000"]
SHA-256
a0d54adc18e4cc4a30434de3e61530fd7fa96ae3e381f41186367aa0bb4805b6

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.