Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18CC0041

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18CC0041","CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG ANGAT RIVER AT BINTOG, PLARIDEL, BULACAN","Flood Control and Drainage","Completed",18619977.88,0,100,"Bulacan 1st DEO","Region III","ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)","2018-03-07","2018-08-10",2018,"Regular Infra - GAA 2018 OO-2",14.90433,120.88862,"301417000","301400000"]
SHA-256
f4f0fab9d06fa4c4976ac0b49dd5e210ec529f4772a96469e1340f86573cd327

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.