Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18CC0107

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18CC0107","CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG ANGAT RIVER AT RUEDA SECTION PLARIDEL, BULACAN","Flood Control and Drainage","Completed",18670235.74,0,100,"Bulacan 1st DEO","Region III","STAR WILLIAM CONSTRUCTION (35938)","2018-04-22","2018-10-09",2018,"Regular Infra - GAA 2018 OO-2",14.90111,120.80749,"301418000","301400000"]
SHA-256
1015fd07410e48d80b0b87c20e202aeed26217f76aa722465f60c0d5faa811db

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.