Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18CC0116

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18CC0116","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION/REHABILITATION OF SLOPE PROTECTION IN STO. NINO, PAOMBONG, BULACAN","Flood Control and Drainage","Completed",28003561.17,0,100,"Bulacan 1st DEO","Region III","ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)","2018-04-02","2018-12-27",2018,"Regular Infra - GAA 2018 OO-2",14.84046,120.80088,"301416000","301400000"]
SHA-256
42d6e8eade33474c2207dfd1f7380bcc914b30f767ad9b69b57a7191b18bdadc

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.