Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18CC0324

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18CC0324","REHABILITATION/IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG GUIGUINTO RIVER DAUNGAN SECTION GUIGUINTO, BULACAN","Flood Control and Drainage","Completed",32479604.48,0,100,"Bulacan 1st DEO","Region III","M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION) (20201)","2018-09-13","2019-03-12",2018,"Regular Infra - GAA 2018 OO-2",14.85695,120.88721,"301408000","301400000"]
SHA-256
14d1fb2bfc591f85bbcff010157510462a9a360088440777dc8113b70fb18582

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.