Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18CD0008

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18CD0008","CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SAN MIGUEL RIVER (DOWNSTREAM), PHASE III AND PHASE IV, SAN MIGUEL, BULACAN","Flood Control and Drainage","Completed",37537198.17,0,100,"Bulacan 2nd DEO","Region III","C.T. LEONCIO CONSTRUCTION & TRADING (17371)","2018-02-15","2018-07-23",2018,"Regular Infra - GAA 2018 OO-2",15.13301,120.95678,"301421000","301400000"]
SHA-256
b49980cecc84a9185271b02d5453abf0de1ef2d07fab8000484452d8cc62f56f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.