Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18CD0015

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18CD0015","CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG DAANG MAHARLIKA AT SAN MIGUEL RIVER BARDIAS SECTION, SAN MIGUEL, BULACAN","Flood Control and Drainage","Completed",29760629.24,0,100,"Bulacan 2nd DEO","Region III","HEXAMINDZ CORPORATION (FORMERLY:KILUSANG MAGKAIBIG (31666)","2018-02-15","2018-07-14",2018,"Regular Infra - GAA 2018 OO-2",15.22789,120.99909,"301421000","301400000"]
SHA-256
ebbbf89355d25ad95a4e66ce61c4506f9ecf720f7afb76e9232f9608d2a0aa5c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.