Hashed input (canonical JSON of the source row)
["dpwh","18CD0034","CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG STA. MARIA RIVER PHASE IV (LEFT SIDE), STA. MARIA, BULACAN","Flood Control and Drainage","Completed",46500251.7,0,100,"Bulacan 2nd DEO","Region III","AZUL BUILDERS (21870)","2018-02-15","2018-08-28",2018,"Regular Infra - GAA 2018 OO-2",14.82682,120.98869,"301423000","301400000"]
SHA-256
80765c89c805a3ebf678642f9c7241412c43fef2cab4256f491803ef8f44ab3d