Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18CD0045

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18CD0045","CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURES ALONG MAASIM RIVER, SAN RAFAEL, BULACAN","Flood Control and Drainage","Completed",46550011.99,0,100,"Bulacan 2nd DEO","Region III","FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO (16916)","2018-02-15","2018-06-18",2018,"Regular Infra - GAA 2018 OO-2",15.03727,120.93345,"301422000","301400000"]
SHA-256
ac5a1f21074e33af0e9d66808fe4d8cbd6a5f4c4ea4792011729b1633e9100fd

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.