Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18CD0109

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18CD0109","CONSTRUCTION OF FLOOD CONTROL STRUCTURES INCLUDING DESILTING/DREDGING ALONG C. DE LEON CREEK, SAN MIGUEL, BULACAN","Flood Control and Drainage","Completed",77182507.42,0,100,"Bulacan 2nd DEO","Region III","ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)","2018-03-14","2018-11-11",2018,"Regular Infra - GAA 2018 OO-2",15.14515,120.96502,"301421000","301400000"]
SHA-256
3d40b0b71c66150f54443676c783ce7747fcd096475f156ed90635c03062fef6

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.