Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18CD0226

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18CD0226","CONCRETING OF BRGY. PINAOD - BULUSUKAN ROAD, PHASE I, SAN ILDEFONSO, BULACAN","Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP","Completed",93950180.67,0,100,"Bulacan 2nd DEO","Region III","ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)","2018-06-07","2019-04-25",2018,"Regular Infra - Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP",15.07305,120.97606,"301419000","301400000"]
SHA-256
cd6928d0dc4f6a9b8fbf1d2b0d11ea70b2ff02cd639b2f9867c405fe265d324e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.