Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18CD0227

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18CD0227","CONCRETING OF BRGY. PINAOD -  BULUSUKAN ROAD, PHASE II, SAN ILDEFONSO, BULACAN","Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP","Completed",93950394.7,0,100,"Bulacan 2nd DEO","Region III","ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)","2018-06-07","2019-07-26",2018,"Regular Infra - Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP",15.08352,121.03118,"301419000","301400000"]
SHA-256
278350b629405a3e2a999ab169b17dcab97a622e60b17edfc8df270da509ca43

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.