Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18CF0113

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18CF0113","CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL AT BRGY. VEGA, BONGABON, NUEVA ECIJA","Flood Control and Drainage","Completed",16977577.08,0,100,"Nueva Ecija 2nd DEO","Region III","FRAMECON BUILDERS (22482)","2018-08-06","2018-10-17",2018,"Regular Infra - GAA 2018 OO-2",15.66023,121.13322,"304923000","304900000"]
SHA-256
d2e585c62e7fa3e4bc8f27776b6841e6d16a77aa851d8a4cbf6209757c9f4842

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.