Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18CG0259

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18CG0259","CONSTRUCTION OF LINED CANAL AT TINAJERO, STA. INES, SAN VICENTE AND CABAMBANGAN, BACOLOR, PAMPANGA","Flood Control and Drainage","Completed",23270114.24,0,100,"Pampanga 1st DEO","Region III","EDDMARI CONSTRUCTION & TRADING (20301)","2018-07-08","2018-11-05",2018,"Regular Infra - GAA 2018 LP",14.98466,120.67152,"305404000","305400000"]
SHA-256
85188228b40bd363af43aa92927e1f601ac13cf787a6d760252b84c6f161349c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.