Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18CG0334

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18CG0334","REHABILITATION/ IMPROVEMENT OF SAPLAD RIVER STA. 0+000 - STA. 4+158 AT MINALIN AND MACABEBE, PAMPANGA","Flood Control: Construction - Channel Excavation, Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)","Completed",27763212,0,100,"Pampanga 1st DEO","Region III","LATO BUILDERS (34243)","2018-09-17","2019-02-13",2018,"Regular Infra - Flood Control: Construction - Channel Excavation, Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)",14.94622,120.68195,"305414000","305400000"]
SHA-256
0c9ea950878d2b5a0e5e8f30367241a59b7df8fbfeb1f23bc44e3c6f91476e8c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.