Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18CH0054

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18CH0054","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION/IMPROVEMENT OF DIKE WITH SLOPE PROTECTION ALONG PORAC RIVER, STA. RITA, LUBAO, PAMPANGA","Flood Control and Drainage","Completed",43988937.19,0,100,"Pampanga 2nd DEO","Region III","TOKWING CONSTRUCTION, CORP.(FOR;  TOKWING CONSTRUC (9650)","2018-07-03","2019-01-28",2018,"Regular Infra - GAA 2018 OO-2",15.01754,120.6131,"305404000","305400000"]
SHA-256
2d04cbf807eca005b37bb9770b562b934547d07205f62ce34a115a1e3a486e0a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.