Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18CH0139

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18CH0139","CONCRETING OF PUROK 2, CALZADANG BAYU FMR, BRGY. CALZADANG BAYU, PORAC, PAMPANGA","Roads","Completed",4719803.25,0,100,"Pampanga 2nd DEO","Region III","TOKWING CONSTRUCTION, CORP.(FOR;  TOKWING CONSTRUC (9650)","2018-08-30","2018-10-28",2018,"Outside Infra - GAA 2018 DA FMR",15.10878,120.58036,"305415000","305400000"]
SHA-256
a83670d8fd6ab38dd24b61dfde2ba2daf1b2440fada46a3d8c85d4ac1c771667

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.