Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18CI0022

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18CI0022","FLOOD MANAGEMENT PROGRAM; CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEM; REHAB OF REINFORCED CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILES FOUNDATION ALONG ABACAN RIVER, ANGELES CITY","Flood Control and Drainage","Completed",92762206.85,0,100,"Pampanga 3rd DEO","Region III","NORTHERN BUILDERS (8789)","2018-04-10","2019-01-04",2018,"Regular Infra - GAA 2018 OO-2",15.15312,120.58796,"330100000","305400000"]
SHA-256
bc5f19af74e0a7dba447f3d59a7b3f1bddd3c6593893f7cf05aa5ea67ab29091

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.