Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18CJ0009

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18CJ0009","CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION/IMPROVEMENT OF SLOPE PROTECTION ALONG TARLAC RIVER CONTROL LEFT DIKE, SAN JOSE-SANTIAGO SECTION, GERONA, TARLAC","Flood Control and Drainage","Completed",27927797.36,0,100,"Tarlac DEO","Region III","R.R. RICAFORT CONSTRUCTION AND SUPPLIES (14402)","2018-01-22","2018-06-30",2018,"Regular Infra - GAA 2018 OO-2",15.55686,120.57729,"306916000","306900000"]
SHA-256
970636f7ba459f9f817c6911cfde01e145586bd89aa7d93c555801f41df384d9

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.