Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18CJ0027

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18CJ0027","CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG TARLAC RIVER CONTROL (LEFT DIKE), BALAOANG SECTION, BALAOANG, PANIQUI, TARLAC","Flood Control and Drainage","Completed",33514735.61,0,100,"Tarlac DEO","Region III","FERDSTAR BUILDERS INC. (4965)","2018-01-22","2018-07-06",2018,"Regular Infra - GAA 2018 OO-2",15.66885,120.52272,"306910000","306900000"]
SHA-256
1cbfdc5a24d38d644b81be7081b146824bfed2acf133034ba9cd278385ee92ff

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.