Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18D00055

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18D00055","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MNGMT. PROGRAM CONST./ MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS CONST. OF REVETMENT ALONG MALIKSI RIVER, EAST SIDE, PHASES I & II, BACOOR, CAVITE","Flood Control and Drainage","Completed",56045414.67,0,100,"Region IV-A","Region IV-A","AARCON BUILDERS (28336)","2018-06-18","2018-12-14",2018,"Regular Infra - GAA 2018 OO-2",14.46177,120.95333,"402103000","402100000"]
SHA-256
19275f380be76e15cf2f3d8cf79c6e1cbdbcef878a13bc312760a23ee97adf83

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.