Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18DB0195

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18DB0195","CONSTRUCTION AND COMPLETION OF SCHOOL BUILDING TWO (2) STOREY FOUR (4) CLASSROOM AT LIAN CS, LIAN, BATANGAS","GAA 2018 DepEd BEFF","Completed",8865038,0,100,"Batangas 1st DEO","Region IV-A","GREENFIELD CONSTRUCTION CORPORATION (FORMERLY:GREENFIELD CONSTRUCTION) (31101)","2018-07-11","2019-01-06",2018,"Outside Infra - GAA 2018 DepEd BEFF",14.03511,120.65293,"401013000","401000000"]
SHA-256
26d68fe61efa9ea0d68d6a4377b2b7acf26e4d36b9a697663577b512cf767ffb

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.