Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18DE0221

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18DE0221","CY 2018 BASIC EDUCATIONAL FACILITIES FUND BATCH 1 - CONSTRUCTION OF 2STY 4CL AT TINGLOY CS, TINGLOY, BATANGAS","Buildings and Facilities","Completed",9678223.63,0,100,"Batangas 2nd DEO","Region IV-A","6 JEWELS CONSTRUCTION (34737)","2018-08-09","2019-01-05",2018,"Outside Infra - GAA 2018 DepEd BEFF",13.65949,120.87154,"401033000","401000000"]
SHA-256
a11f13dc9834ae16e915b399ac95c35f286c671bbd7bd0d01f35550f98c5cea7

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.