Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18DF0008

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18DF0008","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS; FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURESAND DRAINAGE SYSTEM, CONSTRUCTION OF REVETMENT ALONG ILANG-ILANG RIVER, DE OCAMPOSECTION, TR","Flood Control and Drainage","Completed",46531400.85,0,100,"Cavite 1st DEO","Region IV-A","TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) (10684)","2018-01-31","2018-08-28",2018,"Regular Infra - GAA 2018 OO-2",14.30046,120.86981,"402122000","402100000"]
SHA-256
9201dc9fe4c46934442c3affa34390f53f29ed23326441664f19be21702a942d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.