Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18DI0036

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18DI0036","FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL ALONG STA. ROSA RIVER NEAR NIA DAM, BRGY. MACABLING, STA. ROSA CITY, LAGUNA","Flood Control and Drainage","Completed",19202086.5,0,100,"Laguna 2nd DEO","Region IV-A","ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)","2018-02-13","2018-09-07",2018,"Regular Infra - GAA 2018 OO-2",14.29759,121.09445,"403428000","403400000"]
SHA-256
610176c3c87c5c514cace70ba644b5db1f4552ac62c437572b891006020f9bb2

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.