Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18DI0040

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18DI0040","FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD CONTROL ALONG CABUYAO RIVER, BRGY. BIGAA, CABUYAO CITY, LAGUNA","Flood Control and Drainage","Completed",28368650.6,0,100,"Laguna 2nd DEO","Region IV-A","ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)","2018-02-13","2018-11-30",2018,"Regular Infra - GAA 2018 OO-2",14.29428,121.1282,"403428000","403400000"]
SHA-256
d4f791dffdc413febea36cbe6ebe099eaa595fe3792ab5aacd5834132fda90f9

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.