Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18DI0042

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18DI0042","FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL ALONG SAN CRISTOBAL RIVER, BRGY. BANLIC, CALAMBA CITY, LAGUNA","Flood Control and Drainage","Completed",28369398.79,0,100,"Laguna 2nd DEO","Region IV-A","ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)","2018-02-13","2018-10-31",2018,"Regular Infra - GAA 2018 OO-2",14.21925,121.15282,"403405000","403400000"]
SHA-256
3ededb9000083ca28098498feb6b5ba5b66292290e274f8f988715547fd79095

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.