Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18DI0052

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18DI0052","FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL ALONG SALA WATERWAYS, CABUYAO CITY, LAGUNA","Flood Control and Drainage","Completed",28516550,0,100,"Laguna 2nd DEO","Region IV-A","ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)","2018-02-13","2018-11-27",2018,"Regular Infra - GAA 2018 OO-2",14.26601,121.12577,"403404000","403400000"]
SHA-256
d665b9b98f61248111917d2ff3cf35bf50d7d97e86e2082c7db3af154a3e8531

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.