Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18DI0079

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18DI0079","FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL ALONG SAN JUAN RIVER, BRGY. BAÑADERO, CALAMBA CITY, LAGUNA","Flood Control and Drainage","Completed",19600000,0,100,"Laguna 2nd DEO","Region IV-A","R.D. SADSAD CONSTRUCTION & TRADING (19240)","2018-02-21","2018-07-06",2018,"Regular Infra - GAA 2018 OO-2",14.21476,121.16931,"403405000","403400000"]
SHA-256
99e37da7cdb7ad10de30e9c91380643d7abd8f25cbbb6dc172176a14ad8feb27

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.