Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18DI0106

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18DI0106","FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/ IMPROVEMENT OF REVETMENT/ RIVER CONTROL IN MAULAWIN WATERWAYS, LOS BAÑOS, LAGUNA","Flood Control and Drainage","Completed",24500000,0,100,"Laguna 2nd DEO","Region IV-A","ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)","2018-04-16","2018-08-13",2018,"Regular Infra - GAA 2018 OO-2",14.17686,121.25029,"403411000","403400000"]
SHA-256
20eb0205006f75bcdaa2911d74995a10b30c20e28cff987715a5d3069e17cdbf

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.