Project 18DN0082
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18DN0082","REHABILITATION OF ROAD INCLUDING DRAINAGE SYSTEM, GLORIA HEIGHTS, BRGY. DALIG (PHASE 2), ANTIPOLO CITY","Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Rehabilitation - PCCP","Completed",4708511.61,0,100,"Rizal 1st DEO","Region IV-A","EL-JAKE BUILDERS (38162)","2018-03-05","2018-08-01",2018,"Regular Infra - Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Rehabilitation - PCCP",14.56784,121.18329,"405802000","405800000"]
SHA-256
f11cd9b7cbc1bcd1fe945366c5904da5b5f926b7015db84bf278d756b47a1d8dHash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.