Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18DN0198

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18DN0198","CONSTRUCTION OF 2 UNITS, 4 STOREY, 12 CLASSROOM, JOAQUIN GUIDO E/S (ANGONO E/S UNIT I), ANGONO, RIZAL","GAA 2018 DepEd BEFF","Completed",68929020.9,0,100,"Rizal 1st DEO","Region IV-A","EL-JAKE BUILDERS (38162) / SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. (25226)","2019-01-03","2020-02-26",2018,"Outside Infra - GAA 2018 DepEd BEFF",14.53011,121.15345,"405801000","405800000"]
SHA-256
b1a2dee3218b84509ef9ca64e9fb0e989c9277b763f54857cb65d88b651e715a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.