Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18DO0074

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18DO0074","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG MONTALBAN RIVER, RODRIGUEZ, RIZAL","Flood Control and Drainage","Completed",39199695.71,0,100,"Rizal 2nd DEO","Region IV-A","HEXAMINDZ CORPORATION (FORMERLY:KILUSANG MAGKAIBIG (31666)","2018-03-05","2018-09-02",2018,"Regular Infra - GAA 2018 OO-2",14.72359,121.13024,"405808000","405800000"]
SHA-256
29c0ff31b3fe4612c0201c4485c40a901e96f44464da48b2ff6759ed19408abe

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.