Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18EB0184

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18EB0184","CONSTRUCTION OF STANDARD 2-3STY-9CL SCHOOL BUILDING (BATCH 3), POBLACION ES, SABLAYAN, OCCIDENTAL MINDORO","GAA 2018 DepEd BEFF","Completed",64032307.8,0,100,"Mindoro Occidental DEO","MIMAROPA Region","M.A. GUINTO CONSTRUCTION (SAN JOSE BRANCH) (26576)","2019-01-14","2020-08-10",2018,"Outside Infra - GAA 2018 DepEd BEFF",12.8362,120.76894,"1705109000","1705100000"]
SHA-256
63362462e35f93a6b435fa8e0f9ac55116d470ced6ed1da7b194c9b11bf7d310

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.