Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18ED0077

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18ED0077","CONSTRUCTION OF FLOOD CONTROL/DRAINAGE SYSTEM, MAG-ASAWANG TUBIG RIS, NAUJAN, ORIENTAL MINDORO","GAA 2018 LP","Completed",23440845.32,0,100,"Mindoro Oriental DEO","MIMAROPA Region","FRAMECON BUILDERS (22482)","2018-04-29","2018-12-28",2018,"Regular Infra - GAA 2018 LP",13.23748,121.23816,"1705208000","1705200000"]
SHA-256
400e761c4729a7f154d92f4a67dcbeb049a181982a9e34bd7dafbac1021913ab

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.