Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18ED0192

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18ED0192","REPAIR/REHABILITATION/RECONSTRUCTION OF SAN NICOLAS RIVER CONTROL, NAUJAN, ORIENTAL MINDORO","GAA 2018 NDRRMF","Completed",13060853.18,0,100,"Mindoro Oriental DEO","MIMAROPA Region","MARC JILL CONSTRUCTION (39585)","2018-10-07","2019-01-18",2018,"Outside Infra - GAA 2018 NDRRMF",13.24167,121.17606,"1705208000","1705200000"]
SHA-256
5bd747642acc05eb21772dabb6d7781b1e4c31f15b78e17af621d8ca85ed023b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.