Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18EH0011

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18EH0011","CONSTRUCTION OF CANTINGAS FLOOD CONTROL STRUCTURE ALONG SIBUYAN CIRCUMFERENTIAL ROAD, SAN FERNANDO, ROMBLON","GAA 2018 OO-2","Completed",29820521.11,0,100,"Romblon DEO","MIMAROPA Region","LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)","2018-02-28","2018-12-15",2018,"Regular Infra - GAA 2018 OO-2",12.30839,122.59398,"1705913000","1705900000"]
SHA-256
e792c4cc2dee32ef43d9f72d6a1c9eaaa71c0216ab8567cc1eb088e8d845ac9a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.