Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18F00006

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18F00006","OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS:CONST.OF FLOOD MITIGATION STRUCTURES ALONG SAN AGUSTIN RIVER,LIBON AL","Flood Control and Drainage","Completed",171043803.31,0,100,"Region V","Region V","MAKAPA CORPORATION (30029)","2018-03-13","2019-01-31",2018,"Regular Infra - GAA 2018 OO-2",13.27316,123.47635,"500512000","500500000"]
SHA-256
cfc95fd912561004a7d553ada70e5618e7953716284d6c096afccc8bcf85c842

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.