Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18FB0107

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18FB0107","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD MITIGATION SYSTEM ALONG QUIRANGAY RIVER, CAMALIG, ALBAY","Flood Control and Drainage","Completed",93119846.47,0,100,"Albay 2nd DEO","Region V","NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) (15104)","2018-03-21","2018-11-25",2018,"Regular Infra - GAA 2018 OO-2",13.18591,123.65105,"500502000","500500000"]
SHA-256
f435f739b843fd524c50ee7286990941b18e0fe6c12f20afbee7c455a5fac77b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.