Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18FB0172

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18FB0172","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION OF BONGA RIVER, LEGAZPI CITY","Flood Control and Drainage","Completed",46338608.48,0,100,"Albay 2nd DEO","Region V","SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)","2018-07-16","2019-01-11",2018,"Regular Infra - GAA 2018 OO-2",13.18667,123.72361,"500506000","500500000"]
SHA-256
2a3bdfacee36030676cb564f0e05a87514fffcedf22fdec019e85a68dcc56c80

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.