Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18FB0191

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18FB0191","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL SYSTEM ALONG YAWA RIVER, LEFT SIDE, LEGAZPI CITY","Flood Control and Drainage","Completed",45400184.77,0,100,"Albay 2nd DEO","Region V","SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)","2018-07-18","2019-01-13",2018,"Regular Infra - GAA 2018 OO-2",13.16409,123.74434,"500506000","500500000"]
SHA-256
7e847bd11ca8a34248ac5cd8d4a3a2c59ebaf569c872f38d8d232af8e9d9e9d3

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.