Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18FD0031

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18FD0031","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURES/RIVER WALL ALONG BICOL RIVER, BRGY. BORONGBORONGAN, MILAOR, CAMARINES SUR","Flood Control and Drainage","Completed",37985000,0,100,"Camarines Sur 2nd DEO","Region V","G.C.I.  CONSTRUCTION AND DEV'T. CORP. (11346)","2018-02-26","2018-10-09",2018,"Regular Infra - GAA 2018 OO-2",13.57836,123.18122,"501722000","501700000"]
SHA-256
21dba8717a15b652d669f20eeaa06e0ed28cf864d9474b65290797a4783ee31c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.