Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18FG0035

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18FG0035","REHAB. OF FLOOD CONTROL ALONG CAGAS BRIDGE (UPSTREAM AND DOWNSTREAM SECTION), NABUA, CAMARINES SURSTA. 00+025-STA. 00+146(UPSTREAM), STA. 00+152-STA. 00+282(UPSTREAM),STA. 00+20-STA.00+120(DOWNSTREAM SECTION)","Flood Control and Drainage","Completed",41939154.29,0,100,"Camarines Sur 5th DEO","Region V","SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)","2018-03-08","2018-11-16",2018,"Regular Infra - GAA 2018 OO-2",13.48358,123.33902,"501701000","501700000"]
SHA-256
89de82299d4ce0e7bda2762c94810586a5f4b4791a2d76a4c9da6997c85333c1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.