Project 18FI0038
DPWH infrastructure contract
This contract as an OC4IDS project record, the infrastructure standard used by OpenGovChain. Download: JSON
{
"id": "oc4ids-pisoscan-dpwh-18FI0038",
"title": "BRIDGE PROGRAM, WIDENING OF PERMANENT BRIDGES, MANULIB BR. (B00012MT) ALONG JCT. MILAGROS-BALENO-LAGTA RD, K0026+911.20 - K0027+195, BRIDGE LENGTH = 53.20 L.M. (456.86 SQ.M.), APPROACH A = 70.80 L.M.; APPROACH B = 180.80 L.M., REVETMENT = 175.00 L.M. BOTH",
"sector": [
"Bridges"
],
"status": "completed",
"publicAuthority": {
"name": "DPWH Masbate 2nd DEO"
},
"period": {
"startDate": "2018-08-17",
"endDate": "2019-11-14"
},
"budget": {
"amount": {
"amount": 51957184.06,
"currency": "PHP"
}
},
"locations": [
{
"geometry": {
"type": "Point",
"coordinates": [
123.49068,
12.23585
]
}
}
],
"parties": [
{
"name": "SPRING STAR CONSTRUCTION AND SUPPLY",
"roles": [
"supplier"
]
}
],
"contractingProcesses": [
{
"id": "18FI0038",
"summary": {
"title": "BRIDGE PROGRAM, WIDENING OF PERMANENT BRIDGES, MANULIB BR. (B00012MT) ALONG JCT. MILAGROS-BALENO-LAGTA RD, K0026+911.20 - K0027+195, BRIDGE LENGTH = 53.20 L.M. (456.86 SQ.M.), APPROACH A = 70.80 L.M.; APPROACH B = 180.80 L.M., REVETMENT = 175.00 L.M. BOTH",
"status": "closed",
"contractValue": {
"amount": 51957184.06,
"currency": "PHP"
}
}
}
],
"pisoscan": {
"dpwhStatus": "Completed",
"physicalProgressPercent": 100,
"fundingSource": "Regular Infra - GAA 2018 OO-1",
"sourceDataset": "DPWH contract list via BetterGov.ph",
"sha256": "405094ab8819510da02e0a66552134bbda59bfd83dcc76fa620fe51b16d0b002"
}
}