Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18FI0061

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18FI0061","CONSTRUCTION OF 1-UNIT 2-STOREY 2-SCIENCE LABORATORY BUILDING (9.50M X 23.00M) AT DELAVIN-RUBIA NATIONAL HIGH SCHOOL","Buildings and Facilities","Completed",9478020.55,0,100,"Masbate 2nd DEO","Region V","SANSA CONSTRUCTION AND SUPPLY (39227)","2018-07-25","2019-09-17",2018,"Outside Infra - GAA 2018 DepEd BEFF",12.54521,123.34694,"504101000","504100000"]
SHA-256
79418c4ee83e0504a8c39cec693b0a509fd9d8e3390ed5f7570613b524ca884b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.